Skip to main content

Hydroelectric equipment of an existing weird

  • France (19)
  • 2021
  • 163 kW
  • Feasibility study
  • Comparison of 2 scenarios of equipment: hydrodynamic screws or Kaplan turbines operating in a trap, assessment of the optimal number of turbines, choice of the hydrodynamic equipment, assessment of the energy production, description of the construction work and costing, plans. Preparation of the administrative file, discussions with the DDT and OFB. Detailed analysis of the fish pass: diagnostic of the existing fish pass, modelling on “Cassiopée”, proposal and sizing of backfitting scenarios.