Skip to main content

Feasibility study for the rehabilitation of six hydropower plant

  • France (29)
  • 2018-2019
  • 270 kW
  • Feasibility study
  • Rehabilitation of six old power plant located on four locks, in an old flour mill converted into a museum and in an old butter mill under 2 to 3 m head. Total power calculation taking into account the tide phenomenon impacting one of the three sites.