Feasibility study for the rehabilitation of an old power plant in north-west of France

  • France (27)
  • 2023
  • 20 kW
  • Feasibility study
  • On behalf of a private client, HYDREOLE conducted a feasibility study for the rehabilitation of an old power plant equipped with two fountain turbines that have not been operational for 50 years. Following the site visit, HYDREOLE reconstructed the hydrology of the river, examined several scenarios for restoration and drafted a report for requesting water rights recognition.