Feasibility study for the refurbishment of an old mill on the Dree River

  • France (71)
  • 2022
  • 37 kW
  • Feasibility study
  • Feasibility study for the refurbishment of an old mill following the specification of the ADEME: comparison of several equipment scenarios, assessment of the cost of the construction work and studies, assessment of the economical parameters of the project, analysis of the administrative and environmental constraints. Writing of the document for the acknowledgment of the perpetual right to use the water energy assigned to the site. Meeting with the administration and inventory of the existing funding.