Skip to main content

Feasibility study for increasing the power of an existing power plant in the Doubs region

  • France (25)
  • 2021
  • 532 kW
  • Feasibility study
  • Conducting a feasibility study for the rehabilitation and increased capacity of an existing power plant requiring a renewal of authorization and purchase contracts. HYDREOLE has studied multiple scenarios, including the installation of a new plant on the threshold. Within this scenario, HYDREOLE has developed a numerical model to adjust machine priorities.