Feasibility study for increasing the power of an existing power plant in the Doubs region
-
France (25)
-
2021
-
532 kW
-
Feasibility study
-
Conducting a feasibility study for the rehabilitation and increased capacity of an existing power plant requiring a renewal of authorization and purchase contracts. HYDREOLE has studied multiple scenarios, including the installation of a new plant on the threshold. Within this scenario, HYDREOLE has developed a numerical model to adjust machine priorities.