Skip to main content

Expertise / due diligence of a 2 MW power plant

  • France (51)
  • 2018
  • 2000 kW
  • Due diligence
  • Detailed technical expertise of a 2 MW power plant equipped with 4 Francis turbines under a low head: equipment assessment, operating and maintenance program recommendation, installed power optimization.