Expertise / due diligence of a 2 MW existing power plant
-
Sao Tomé-et-Principe
-
2018
-
2000 kW
-
Feasibility study
-
Detailed due diligence of all the scheme's equipment (penstock, gates, turbines, generators, electrical cabinets, automation, grid connection, grid capacity) of an existing 2 MW HEPP under 500 m head in Sao Tome-and-Principe. Optimization scenarios research and description.