Skip to main content

Existing medium head dam flow turbines study

  • France (2A et 2B)
  • 2010
  • 1 000 kW
  • Feasibility study
  • Detailed feasibility study of three hydroelectric schemes turbining the compensation water of existing EDF's dams.