Skip to main content

Due diligences of 4 existing hydroelectric plants

  • France (73)
  • 2014
  • 30 000 kW
  • Due diligence
  • Due diligence of four HEPP built between 1908 and 1974: documentation analysis (general assembly and detailed drawings, maintenance, and rehabilitation records, etc.), existing equipment expertise (penstock, gates, turbines, regulation), rehabilitation or upgrade works recommendation and cost estimate.