Skip to main content

Due diligence of existing power plants in France

  • France (39)
  • 2022
  • 350 kW
  • Feasibility study
  • The mission was to study the grouping of two existing power plants in one new hydroelectric scheme using the global head of the two old plant. The main investigations carried out for this mission were: reconstruction of hydrology, calculation of the gross head available, calculation of the production.