Skip to main content

Due diligence of an existing power plant in Jura Mountain

  • France (39)
  • 2022
  • 500 kW
  • Due diligence
  • Due diligence of an old hydro power plant (1924) with an 8m height dam, a penstock and 2 Francis turbine under 30 m height. Analysis of the production records and development of several scenarios of rehabilitation in order to increase the power and change the purchase contract of electricity.