Skip to main content

Due diligence of 4 low and medium head hydroelectric schemes

  • France (07)
  • 2016 - 2017
  • 500 kW
  • Feasibility study
  • Due diligence of 4 weirs to be equipped with turbine for energy production in an urban area to avoid the destruction of the dam.