Skip to main content

Due diligence of 14 hydroelectric schemes in French West Indies

  • France (97)
  • 2019
  • 10 000 kW
  • Feasibility study
  • Detailed visit of 14 hydroelectric schemes with unit installed capacity varying between 100 kW and 2500 kW, technical review of the equipment and maintenance program, analysis of the past production and forecast.