Due diligence of 13 small hydroelectric plants

  • France (08, 11, 12, 24, 43)
  • 2017
  • 7 200 kW
  • Feasibility study
  • Due diligence of 13 hydroelectric power plants, with installed power from 400 kW to 1200 kW: analysis of the past production, schemes numerical model building incl. the dam, canal, penstock, turbine, generator, and connection to the grid.