Skip to main content

Detailed feasibility study of a Pelton turbine rehabilitation under 600 m head

  • France (73)
  • 2013
  • 12 000 kW
  • Summary preliminary study
  • Sizing and cost estimate of a new Pelton turbine (11900 kW) replacing the old one (8 MW) under 600 m head (civil works should be minimized): turbine type/configuration definition and description, sizing, cost estimate.