Detailed feasibility study of a hydroelectric power plant under operation
-
France (26)
-
2013
-
2 000 kW
-
Feasibility study
-
Detailed feasibility study of the rehabilitation of a hydroelectric power plant built in the 1920's; equipped with two horizontal Francis turbines of 1 MW each. The aim is to find the best scenario to reduce the payback time and allow a new regulated selling contract.