Skip to main content

Detailed feasibility study for the construction of a new HEPP in Sierra Leone

  • Sierra Leone
  • 2016
  • 10 000 kW
  • Summary preliminary study
  • Detailed feasibility study incl. on site measurement campaign, concept freeze, energy production and optimization, technical aspects bound to isolated network.