Skip to main content

Detailed feasibility study for the complete optimization of two EDF's plants

  • France (74)
  • 2015 - 2016
  • 2 300 kW
  • Feasibility study
  • Detailed feasibility study of the refurbishment, upgrade, and optimization of two hydroelectric power plants (700 kW Pelton + 3 x 550 kW Francis) operated by Electricite de France.