Skip to main content

Detailed design studies of 2 new medium head projects

  • France (74)
  • 2019-2020
  • 4500 kW
  • Feasibility study
  • Detailed preliminary designs of two new hydroelectric projects (medium head between 80 and 100 m) in the north of the Alps, of 2.0 MW and 2.5 MW respectively: Design of each infrastructure (fish pass, intake, desilting basin, load chamber, penstock, powerhouse, hydro-mechanical and electrical equipment, connection to the grid) and financial analysis.