Skip to main content

Design study of a new medium head hydro scheme in the Vosges

  • France (88)
  • 2020
  • 500 kW
  • Summary preliminary study
  • The project consists in creating a bypass to fourteen existing weirs to generate electrical power. Detailed design includes fish friendly intake, desilting basin, load chamber, penstock, powerhouse and double regulated Kaplan turbine. The scope of work includes the geotechnical investigations.