Skip to main content

Assistance to the owner for a hydropower plant on drinking water system

  • France (64)
  • 2018
  • 450 kW
  • Summary preliminary study
  • Feasibility of the installation of a Pelton turbine on the drinking water system. Assistance for the selection of a financial partner able to design and build the plant. Assistance for the selection of the owner engineer for the rehabilitation of the drinking water system.