Administrative file for the end of the concession period

  • France (11)
  • 2022
  • 800 kW
  • Feasibility study
  • Update of the end of the concession file of a hydroelectric power plant in the French department of Aude, submitted in 2016. The database analysis was carried out, missing elements since the submission of the file were added, the amortization table was defined.