Skip to main content

Refurbishment of a former mill on the Auvezere River.

  • France (24)
  • 2021-2025
  • 140 kW
  • Complete project management
  • Feasibility studies for the refurbishment of the old mill, administrative recognition of the perpetual right to use water energy, detailed design studies. Hydreole prepared the administrative file and has been commissioned to perform the full project management of the project.