Preliminary design studies of three high head hydro projects in the French Alps

  • France (05)
  • 2018-2019
  • 4240 kW
  • Due diligence
  • Hydrological survey, supervision of the preliminary geological survey, site visits to locate the intakes, penstocks and buildings, design of the civil structures and equipment, cost estimation, 2D and 3D drawings.