Pre-feasibility study following ADEME’s specifications

  • France (21)
  • 2024-2025
  • 53 kW
  • Summary preliminary study
  • Pre-feasibility study for the hydroelectric equipment of a former forge installed between two mills on a branch of the Ource river. Drafting of the specifications for the selection of a surveyor, and the administrative recognition of the perpetual right to use water energy.