Feasibility study of an old mill on the Somme river
France (80)
2024
30 kW
Feasibility study
For a municipal gas and electricity utility, HYDREOLE conducted a feasibility study for the rehabilitation of a former mill located in the town center of Péronne. The study included an assessment of the site's potential, the analysis of various development scenarios, and an evaluation of the energy production value, enabling the utility to assess the relevance and viability of the project.