Skip to main content
Home
Works
Team
Projects
Easydro
Contact
Home
Works
Team
Projects
Easydro
Contact
Due diligence of 13 small hydroelectric plants
France (08, 11, 12, 24, 43)
2017
7 200 kW
Feasibility study
Due diligence of 13 hydroelectric power plants, with installed power from 400 kW to 1200 kW: analysis of the past production, schemes numerical model building incl. the dam, canal, penstock, turbine, generator, and connection to the grid.
+
+