Due diligence and feasibility study of an existing power plant in Jura Mountain

- France (39)
- 2022
- 500 kW
- Feasibility study
- Due diligence of an old hydro power plant (1924) with an 8m height dam, a penstock and 2 Francis turbine under 30 m height. Analysis of the production records and development of several scenarios of rehabilitation in order to increase the power and change the purchase contract of electricity. Following this expertise, HYDREOLE conducted a feasibility study for a scenario of increased capacity and the installation of a new power plant.