Detailed feasibility study of a hydroelectric power plant under operation
France (26)
2013
2 000 kW
Feasibility study
Detailed feasibility study of the rehabilitation of a hydroelectric power plant built in the 1920's; equipped with two horizontal Francis turbines of 1 MW each. The aim is to find the best scenario to reduce the payback time and allow a new regulated selling contract.