The site has recently been purchased. Hydreole has tasked with studying different rehabilitation scenarios : refurbishment of the existing turbine, replacement of the turbine to qualify for a “H16 renovation” contract or to a “H16.neuf” contract.

Feasibility study for the refurbishment of an existing hydropower plant, conserving the historical turbine
France (07)
2025
55 kW
Feasibility study