Expertise / due diligence of a 2 MW power plant

France (51)

2018

2000 kW

Due diligence

Detailed technical expertise of a 2 MW power plant equipped with 4 Francis turbines under a low head: equipment assessment, operating and maintenance program recommendation, installed power optimization.