Feasibility study for the refurbishment of a former mill on the Bourbince river

France (71)

2025-2026

45 kW

Feasibility study

Feasibility study following ADEME’s specifications. The dimensions of the existing structures limit the design discharge and the size of the turbines that could be installed in the existing water chambers. Several scenarios were compared to identify the more suitable solution.