Feasibility study for the refurbishment of a former hydropower plant on the Grosne river

France (71)

2025-2026

96 kW

Feasibility study

Feasibility study following ADEME’s specifications. Comparison of various equipment scenarios. Due diligence of the existing early XXth century turbine