Feasibility study for a new high head hydropowerplant in the French Alps

France (73)

2024

4500 kW

Feasibility study

HYDREOLE conducted a full feasibility study for the installation of a new high-head hydroelectric scheme in the Alps. The study included the optimization of the intake and powerhouse locations, as well as the complete design of the system including the intake structure, desander, penstock, turbine, and electrical equipment.