The old mill has been converted into a spinning factory. To reduce its energy and water consumption, the factory aims to refurbish the former mill with a hydroelectric turbine. HYDREOLE carried out the feasibility and detailed design studies for the refurbishment of the mill. HYDREOLE has been commissioned to prepare the administrative file for the project authorisation.

Detailed design studies for the refurbishment of an old mill on the Cher River
France (23)
2023-2024
22 kW
Detailed design study