Technical assessment of a 1933 power plant. Analysis of the actual output based on operator-provided data and comparison with the potential output to determine the percentage of unavailability. Identification of scenarios for the renovation of the power plant to transition to H16 [presumably a technical specification] and determination of a purchase price for the power plant with a sufficiently favorable payback period considering the required renovations.

Technical assessment and calculation of the acquisition cost of a power plant from 1933
France (87)
2023
320 kW
Due diligence
