Hydroelectric equipment of an existing weir

France (19)

2021-2025

150 kW

Complete project management

Detailed design studies for the equipment of an existing weir with 2 hydrodynamic screws. Analysis of the existing fish pass and design of a new one to improve fish migration. Complete project management during construction work.