Power generation was discontinued after more than 100 years operation, already 20 years ago. Capacity shall be upgraded: gross head increase of the weir height with tilting gates, nominal discharge increase with brand new double regulated Kaplan turbines, hydraulic structures optimization. Integrated fish ladder to restore natural migration.
Refurbishment of a 1’000 kW low-head hydroelectric scheme
France (25)
2020
1000 kW
Summary preliminary study