Pre-feasibility for the rehabilitation of an old mill

France (01)

2020

15 kW

Summary preliminary study

The project consists in creating a bypass to fourteen existing weirs to generate electrical power. Detailed design includes: fish friendly intake, desilting basin, load chamber, penstock, power house and double regulated Kaplan turbine. The scope of work includes the geotechnical investigations.