Design study of a new medium head hydro scheme in the Vosges

France (88)

2020

500 kW

Summary preliminary study

The project consists in creating a bypass to fourteen existing weirs to generate electrical power. Detailed design includes fish friendly intake, desilting basin, load chamber, penstock, powerhouse and double regulated Kaplan turbine. The scope of work includes the geotechnical investigations.