Detailed feasibility study for the complete optimization of two EDF’s plants

France (74)

2015 - 2016

2 300 kW

Feasibility study

Detailed feasibility study of the refurbishment, upgrade, and optimization of two hydroelectric power plants (700 kW Pelton + 3 x 550 kW Francis) operated by Electricite de France.